St. Petersburg Beach, Florida | Knoxville, Tennessee

Training Project - PDA

Step 1 - Loading The Material



Loading Material #1 A. After opening the front cover, locate the workpiece chuck.
Loading Material #2 B. Locate the shown material needed for Training Project included in the training kit.
Loading Material #3 C. Insert the material into the workpiece chuck, and tighten the chucking knob. Slide the core-support so that the tip or the live center presses into the material, and tighten the core-support retaining lever.